Skip to main navigation.

Distributed Generation

Member Owned Distributed Generation

Lyon-Lincoln Electric Cooperative will assist members looking to interconnect their own electric generation equipment with our system. We follow the Minnesota statewide standards for interconnection. LLEC’s Distributed Generation Policy, sample contract and Interconnection Process, State Statute, and Rules Implementing Statute 216B.164 are listed below to assist you. The safety of the general public and the safety of our employees is of the utmost importance, therefore all interconnection applications are contingent on the equipment and interconnection obtaining certification from a State of Minnesota licensed state electrical inspector. Advanced planning is required and it is highly recommended that you contact us at the beginning of your planning process to assist with your project.

MN Statute 216B.164

Adopted Cogeneration Policy - 606

Adopted Cogeneration Rules

Cogeneration Rate Schedule

Pre-Application Request Application

Simplified Interconnection Application

Standard Interconnection Application

Storage Application

Certification of Completion

C-MIP Process Overview

C-MIP Simplified Process

C-MIP Fast Track Process

C-MIP Study Process

Technical Requirements

Uniform Contract for Cogeneration and Small Power Facilities - Sample

C-MIP Interconnection Agreement - Sample

For more information, please contact Lyon-Lincoln Electric at 507-247-5505 or email@llec.coop.

 

Powered by Touchstone Energy Cooperatives Logo
Safe Electricity